Solutions / Juou

Manufacturing & checks

Understand the capabilities Juou has confirmed and specify the checks your order needs.

Juou workshop view showing extrusion equipment and work areas
Production workshop

Confirmed capabilities

A clear scope for a useful discussion.

Production from samples or drawings

Customer samples and drawings can be used as the basis for discussing a production requirement.

In-house mould making

We can make new moulds when the project requires them. Mould costs are charged separately.

Order-specific packaging

Products are mainly packed in cartons. Some products require pallets; customer-specific packaging can be discussed for the order.

Quality requirements

Agree what needs to be checked.

Some products are tested before shipment. Discuss the checks needed for your order in advance; testing is not automatically provided for every product.

Include acceptance requirements in your brief

If a dimension, mounting fit, appearance or packaging requirement is important to your project, identify it before an order is agreed. Discuss whether a particular check or report is required and whether it can be provided.

This is a checklist for discussing your requirements, not a claim that every listed check is part of Juou’s standard inspection procedure.

Plan delivery around the actual order.

Production timing

Orders generally take around 7–20 days after receipt of prepayment, depending on quantity. New mould development and sample timing are confirmed separately.

Dispatch arrangements

EXW and FOB terms are available. The named place or port and the responsibilities of each party are confirmed with the order.

Start a conversation

Let’s find the right starting point.

Start with a product name, photograph, sample or drawing. Tell us what you need the profile to do.

Prepare an enquiry